The completed Surfside levee measures 190 metres long and 10 metres wide, built from 2,700 tonnes of rock and topped with sand, soil, and native plantings, with a pedestrian pathway added. With the levee finished, council attention now shifts to a 21,000-tonne rock seawall at Caseys Beach designed for a 30-year life and future height-raising capability.