50Hertz and Elia Launch EUR 752 Million Offshore HV Cable Jointing and Repair Logistics Tender

OffshoreWIND.biz15 jun 2026Toelevering
Automatisch samengesteld met AI uit de vermelde bronnen

The tender splits into six lots: 50Hertz’s Lots 1–3 cover repair logistics at EUR 110 million each, Lots 4–5 cover jointing services at EUR 19.2 million each, and Elia’s Lot 6 covers jointing in the Belgian North Sea at EUR 7.6 million. The framework runs from 1 November 2027 to 31 October 2035 with an optional two-year extension, awarded through a negotiated two-stage procedure with expressions of interest due by 9 July 2026.