News Content Hub - Jan De Nul to acquire modular, shallow water trenching machine
rivieramm.com15 Sep 2026AI generated
Jan De Nul confirmed the Osbit-built Crayfish trencher, delivered by end-2026 and operating from 2027, will work from converted vessel Henry Darcy.
Burial to 5 m in water depths up to 200 m
Modular, containerised design; deployment both offshore and nearshore
First role: TenneT "2 GW" programme shallow-water cable burying
Pumps located on Henry Darcy instead of the machine, enabling very shallow-water work
Context
The Crayfish was presented by Jan De Nul on 14 September as a vessel due in 2026 for 2027 TenneT cable work, and Osbit's contract landed the same week.