Odfjell Drillings in 2009 gebouwde boorplatform hervat werk na onderbreking door BOP-incident

Offshore Energy — Dredging3 aug 2026Markt
Automatisch samengesteld met AI uit de vermelde bronnen

Geen desk-note voor dit artikel — hieronder de tekst van de bron.

Scotland-headquartered offshore drilling contractor Odfjell Drilling has disclosed the return to work of its 17-year-old semi-submersible, following repairs in the wake of an equipment-handling incident that ended rig activity earlier this year. The post Odfjell Drilling’s 2009-built rig goes back to work after BOP incident-related hiatus appeared first on Offshore Energy .