DredgeWire17 Sep 2026AI generated
Mechanical strike-removal dredging began 16 September at the Kaskaskia River mouth.
- River mile 0–0.6, to Costello Lock and Dam
- 0600–1800 daily, completion estimated 23 September at 1800
- USACE M/V Pathfinder is the contact boat on VHF-FM
- No mooring behind downstream guide wall or within 1,600 ft below the dam from 18 September 1200
Source