Western LNG awarded Allseas the contract for the subsea section of the Prince Rupert Gas Transmission pipeline, comprising approximately 50 km of 36- and 48-inch concrete-weight coated pipe linking the onshore transmission system to the Ksi Lisims floating LNG facility. Pipelay vessels Solitaire and Sandpiper will execute the work, with multiple shore crossings and trenching, in water depths up to 450 m, with offshore installation scheduled for 2029.