NBO confirmed that the second of two 85-kilometre export cables has been installed by Enshore Subsea, with offshore jointing and termination next. The 1.1 GW Inch Cape project, owned by ESB and Red Rock Renewables, will use 72 Vestas V236-15.0 MW turbines on 54 monopiles and 18 jackets, targeting first power in late 2026 and full commercial operation in 2027.