Alterric’s six awarded onshore wind projects, totalling 242 MW, came from the May EEG auction that was 2.6 times oversubscribed, with all farms scheduled to go online in 2028. Four are newbuilds at Apensen (Lower Saxony), Welsches Lied (Hesse), Osterfeld (Saxony-Anhalt) and Durmersheim (Baden-Württemberg); the two repowering projects are Bentstreek (Lower Saxony) and Ebendorf (Saxony-Anhalt). Some projects are to be realized jointly with partners.