The deals cover two projects with Planungsbüro Düser: Möhnesee-Westrich pairs a 5 MW/10 MWh battery with two E-138 EP3 turbines totalling 8.52 MW, and Soest-Meiningsen pairs a 15 MW/30 MWh battery with one operating E-138 EP3 and one planned E-160 EP5 turbine totalling 9.82 MW; both are slated for commissioning in Q1 2027.