The awards cover the 100.8MW Beerfelde wind farm in Brandenburg and the 7.2MW Hassendorf repowering project in Lower Saxony, following the Federal Network Agency’s tender round on 1 May 2026. The Hassendorf award adds a third turbine to the project, after two turbines were awarded in August 2025. PNE is also examining integration of a battery energy storage system at Beerfelde.