Caledonian Maritime Assets Limited (CMAL) stated that the dredging, part of the Port Ellen Terminal Development Project, is using the same licensed disposal site that was employed during the 2011–2012 pier reconstruction, with environmental controls and monitoring in place and no meaningful change to local wave conditions, tidal levels, or flood risk anticipated.