The Mobile District has released a phased closure schedule for Holt Lock starting July 13 with a 60-day continuous closure, followed by a reopening from September 11 through October 1, then a 25-day closure from October 2 to October 26, before switching to a five-day-closed, two-day-open weekend schedule through November 6. The work is for a permanent repair to a lock monolith that had previously required a 102-day emergency closure in 2024 for a temporary fix involving a bulkhead installed over a cracked fill culvert.