The St. Louis Engineer District awarded the $43.6 million contract on July 10 for rock excavation, lock foundation work, a new separator wall, a flow deflector, and preparation of an upland staging area. The work is part of the Navigation and Ecosystem Sustainability Program to build a new 1,200-foot lock chamber adjacent to the existing 600-foot Lock 25, with construction starting this summer.