Geen desk-note voor dit artikel — hieronder de tekst van de bron.
Perenco and Porto do Açu have signed a letter of intent to develop an offshore electrification scheme for the Pargo and Cherne production clusters in the Campos Basin. The project would connect the shallow-water facilities to Brazil’s onshore grid through an 80 km subsea cable running from a new substation at Porto do Açu, in …