DredgeWire17 Sep 2026AI generated
USACE will dredge over six miles of the Lewes-Rehoboth Canal from October through March, starting at the Route 9 bridge in Lewes.
- 89,000 cubic yards of sediment to be removed
- Cottrell Contracting Corporation of Chesapeake, Virginia, awarded a $9.6 million contract
- Canal connects Delaware Bay with Rehoboth Bay
- Significant channel width likely blocked for the project duration
Sources of this news
2